符合電纜橋架接地干線回路的條件是什么?

電纜橋架的接地,當設計允許利用橋架系統構成接地干線回路時,應符合下列要求:
The grounding of cable tray shall meet the following requirements when the design allows the use of tray system to form grounding trunk circuit:
1.金屬電纜橋架及其支架引入或引出的金屬電纜導管必須接地(PE)或接零(PEN)可靠,且必須符合下列規范:
1. The metal cable conduit leading in or out of the metal cable tray and its support must be reliably grounded (PE) or neutral (pen), and must comply with the following specifications:
(1)金屬電纜橋架及其支架全長,與接地(PE)或接零(PEN)干線相連接不小于2處,使整個橋架為一個電氣通路。
(1) The total length of the metal cable tray and its support shall be connected with the grounding (PE) or neutral (pen) main line at least two places, so that the whole tray is an electrical path.
(2)非鍍鋅電纜橋架間連接的兩端跨接銅芯接地線,接地線小允許截面積不小于4mm2。
(2) The two ends of non galvanized cable tray are connected with copper core grounding wire, and the allowable cross-sectional area of grounding wire is not less than 4mm2.
(3)鍍鋅電纜橋架間連接板的兩端可不跨接接地線,但連接板兩端不少于2個有防松螺帽或防松墊圈的連接固定螺栓。
(3) The two ends of the connecting plate between the galvanized cable trays may not cross the grounding wire, but the two ends of the connecting plate shall not be less than 2 connecting fixing bolts with locking nuts or locking washers.
2.盤、梯架端部之間連接電阻不應大于0.00033Ω并應用等電位聯結測試儀(導通儀)或微Ω表測試,測試應在連接點的兩側進行,對整個橋架全長的兩端連接電阻不應大于0.5Ω或由設計決定,否則應增加接地點,以滿足要求。接地孔應涂層,與涂層接觸的螺栓有一側的平墊應使用帶爪的專用接地墊圈。
2. The connection resistance between panel and ladder end shall not be greater than 0.00033 Ω, and shall be tested by equipotential bonding tester (conductometer) or micro Ω meter. The test shall be conducted on both sides of the connection point, and the connection resistance at both ends of the whole bridge length shall not be greater than 0.5 Ω or determined by the design, otherwise, the grounding point shall be added to meet the requirements. The coating shall be removed from the grounding hole, and the special grounding washer with claw shall be used for the flat pad on one side of the bolt in contact with the coating.
3.伸縮縫或軟連接處需采用編織銅線連接。沿橋架全長另敷設接地干線時,每段(包括非直線段)托盤、梯架應小有一點與接地干線可靠連接;在接地部位的連接處應裝置彈簧墊圈,以免松動。
3. The expansion joint or flexible joint shall be connected with braided copper wire. When another grounding main line is laid along the full length of the bridge, the tray and ladder of each section (including non-linear section) shall be reliably connected with the grounding main line at a small point; The spring washer should be installed at the connection of the grounding part to avoid loosening.
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 99精品免费在线观看 | 日韩毛片在线 | 成人先锋 | 狠狠色综合久久婷婷 | 成人国产精品视频频 | 亚洲国产欧美在线人网站 | 国产成人精品一区 | 成人1234| 800精品国产导航 | 国产精品视频久久久 | 国产精品亚洲综合久久 | 好大好硬好湿好紧h | 微福利92合集 | 九九久久国产精品免费热6 九九精品视频一区二区三区 | 日本中文字幕一区二区三区不卡 | 亚洲第一色视频 | 成人网址大全 | 30分钟的高清视频在线观看 | 国产精品久久久久网站 | 精品久久伦理中文字幕 | v视界影院.vsjla | 狠狠撸在线影院 | 无码天堂亚洲国产AV久久 | 继的朋友无遮漫画免费观看73 | 国产第一自拍 | 精品亚洲欧美中文字幕在线看 | 99精品视频在线观看 | 国产欧美va欧美va香蕉在线观 | 成人福利在线视频免费观看 | bt7086新片速递亚洲最新合集 | 日本成人高清视频 | 99久久er这里只有精品17 | 日韩香蕉视频 | 日本激情小说 | 欧美一区二区三区大片 | chanelpreston欧美网站 | 天天综合色天天综合 | 欧美精品一二三区 | 99国产精品久久久久久久... | 国产一级一级片 | 大吊操 |