橋架安裝在不同場(chǎng)合如何接地

在我們使用橋架的過程中,根據(jù)其安裝的場(chǎng)合不同,其采用的接地方式也是不一樣的,那么您知道分別采用的什么樣的接地方法嗎?下面我們?yōu)槟硐嚓P(guān)內(nèi)容。
In the process of using the cable tray, the grounding methods are different according to the different installation occasions. Do you know what grounding methods are used? Now let's organize the relevant content for you.
在我們使用橋架的過程中,根據(jù)其安裝的場(chǎng)合不同,其采用的接地方式也是不一樣的,那么您知道分別采用的什么樣的接地方法嗎?
In the process of using the cable tray, the grounding methods are different according to the different installation occasions. Do you know what grounding methods are used?
橋架可能存在的安裝場(chǎng)合以及如何接地的情況有以下三種:
There are three possible installation occasions and grounding methods for cable tray:
1、當(dāng)允許利用橋架系統(tǒng)構(gòu)成接地干線回路時(shí),橋架端部之間連接電阻應(yīng)不大于0.00033歐姆 ,接地孔應(yīng)絕緣涂層。在1KV及以下中性點(diǎn)直接接地系統(tǒng)中,受電設(shè)備的接地與系統(tǒng)中性線接地相連。
1. When the cable tray system is allowed to form the grounding trunk circuit, the connection resistance between cable tray ends shall not be greater than 0.00033 ohms, and the insulation coating shall be removed from the grounding hole. In the neutral point direct grounding system of 1KV and below, the grounding of the receiving equipment is connected with the system neutral line grounding.
2、裝有處動(dòng)切斷供電裝軒時(shí),橋架的級(jí)長(zhǎng)方向金屬橫截面積應(yīng)不小于規(guī)定值。沿橋架全長(zhǎng)另敷設(shè)接地干線時(shí),每段(包括非直線 段)橋架應(yīng)少有一點(diǎn)與接地干線可靠連接。
2. When equipped with automatic cut-off power supply device, the metal cross sectional area of the cable tray in the level direction shall not be less than the specified value. When the grounding main line is laid along the full length of the bridge, at least one point of each section (including the non straight line section) of the bridge shall be reliably connected with the grounding main line.

橋架安裝在不同場(chǎng)合如何接地
How to ground the cable tray in different occasions
3、對(duì)于振動(dòng)場(chǎng)所,橋架不同的安裝場(chǎng)合的接地要點(diǎn)說明:在接地部位的連接處應(yīng)裝置彈簧圈。
3. Key grounding points for vibration places and different installation occasions of bridge: spring coil shall be installed at the connection of grounding parts.
電纜橋架之間可利用連接板作為跨接線,把橋架連成一體。在連接板兩端的兩只連接螺栓上加鍍鋅彈簧墊圈,橋架之間用軟銅線進(jìn)行跨接,再將橋架與接地線相連,形成電氣通路。橋架整體與接地干線應(yīng)有不少于兩處的連接。接地作業(yè)完成后需要檢查驗(yàn)收。
Connecting plates can be used as jumpers between cable trays to connect them into a whole. Galvanized spring washers are added to the two connecting bolts at both ends of the connecting plate. Soft copper wires are used for bridging between bridges, and then the bridge is connected with the grounding wire to form an electrical path. There shall be at least two connections between the whole bridge and the grounding trunk. Inspection and acceptance are required after the grounding operation is completed.
以上就是為大家介紹的有關(guān)山東電纜橋架的詳細(xì)的介紹,希望對(duì)您有所幫助.如果您有什么疑問的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務(wù)http://www.offroader.com.cn
The above is a detailed introduction of Shandong cable tray for you. I hope it will be helpful to you. If you have any questions, please contact us. We will provide you with our attitude http://www.offroader.com.cn
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 久久这里只有精品无码3D | 欧美同性video | 1717she精品视频在线观看 | chinese男同志gay免费 | 四虎影视884aa·com | 亚色九九九全国免费视频 | 故意短裙公车被强好爽在线播放 | 欧美日韩视频在线成人 | 欧美不卡一区二区三区免 | 四虎永久网址影院 | 午夜国产在线视频 | 国产精品嫩草影院在线 | 波多野结衣黑人系列在线观看 | 阿v天堂2020 α片免费 | 国产人成77777视频网站 | 日本午夜影院 | 厨房play黄瓜进去小说h | 国产精品视频2021 | 亚洲精品免费观看 | 7777奇米影视| 亚州vs欧州vs日 | 校草太大了h | 午夜理论电影在线观看亚洲 | 好吊妞视频998www | 99在线在线视频免费视频观看 | 93版高校教师 | 天天操免费视频 | 国产自精品 | 办公室出轨秘书高h | 呜嗯啊野战h呻吟男男双性 污小说在线阅读 | 99精品视频在线观看re | 美女被视频网站看免费入口 | 亚洲AV无码国产精品色午夜情 | 国产成人综合精品一区 | xxx88视频在线观看 | xxxxx性13一14 | 欧美性f | 日本高清在线看免费观看 | 欧美高清日韩 | 99久久精品自在自看国产 | 亚洲一区二区三区91 |